Home Return Search Feedback Company Info.

Welcome to Full Moon Racing ... This site is dedicated to open wheel road racing !            

 

The latest news about Full Moon Racing

A collection of racing pictures

Products offered for sale by Full Moon Racing

Various links related to racing

 
 
 
Copyright ©  1999- 2008
Full Moon Racing
Last modified: 10/04/2007

 

Hit Counter

 

Body work changes to the car starting in the fall of 2000

WOW what a lot of work!

Phase 1 - The theory stage
The beginning stages of re-construction and preparation for aerodynamic testing

    

Phase 2 - The testing stage - Jan-Mar 2001
Testing various combinations of changes to the body work to create the best air flow over the body with as little detached air as reasonably possible, and the best air flow into the cooling ducts

100 yards of tuffs cut to 3" in length and taped to the bodywork

Phase 3 - Post testing - March 2001
Most of the changes were made on the tail section to clean up the air around the zero roll rockers, the tail pipe and the back side of the heads

tail_l.jpg (27476 bytes)  tail_r.jpg (18728 bytes)  tail.jpg (21758 bytes)

Phase 4 - Mold making
On to the Mold making and new body work

more